120KW Rapid EV Charging Station from China Suppliers | CE OCPP1.6/2.0J CCS2 GBT | Electric Car Charging Factory
Digital Management
📡 Remote Monitoring Platform
Real-time viewing of charging power, voltage, current, and cumulative power consumption, supporting multi-pile cluster management (a single platform can connect over 1,000 charging piles).
🔄 OTA Remote Upgrade
No on-site operation is required. Software version iteration is achieved through 4G/Wi-Fi, and the charging strategy is continuously optimized.
🖐️ Humanized Interaction
7-inch capacitive touch screen: Supports 8 customizable languages including Chinese, English, French and German, and displays real-time charging progress, electricity price information and fault prompts.
🔌 Plug and Charge
Supports RFID card swiping authentication (standard) and QR code scanning for activation (optional), suitable for both C-end users and B-end fleet management.
✅
Full Protocol Dual Gun Design: CCS2+GBT interface covering the global mainstream market, one device meets the needs of multiple regions.
✅
120kW Continuous Fast Charging: Liquid cooling technology ensures stable high power output, charging efficiency 10% higher than similar products.
✅
Intelligent Operation & Maintenance System: OCPP 2.0J protocol supports full digital management and reduces operating costs by 30%.
✅
Extreme Environment Fit: -30°C low temperature start, IP54 protection, suitable for high altitude, coastal, severe cold and other complex scenarios.
💬
Frequently Asked Questions
Q
How many charging piles can be managed on a single remote monitoring platform?
A single platform can connect and manage over 1,000 charging piles simultaneously, supporting real-time monitoring of charging power, voltage, current, and cumulative power consumption for each unit.
Q
Does the charging pile support OTA remote upgrades?
Yes. OTA remote upgrades are supported via 4G or Wi-Fi networks. No on-site operation is required — software version iterations and charging strategy optimizations are all performed remotely.
Q
What authentication methods are available for activating a charging session?
The charging pile supports RFID card swiping authentication as a standard feature, and QR code scanning for activation as an optional feature. It is suitable for both individual (C-end) users and enterprise fleet management (B-end) scenarios.
Q
Which EV connector standards does this charging pile support?
The charging pile features a full protocol dual gun design with both CCS2 and GBT interfaces, covering the global mainstream market. One device can serve the needs of multiple regions without additional adapters.
Q
Is this charging pile suitable for extreme weather conditions?
Yes. The unit supports low-temperature startup at -30°C and carries an IP54 protection rating, making it suitable for deployment in high-altitude areas, coastal environments, and regions with severe cold or complex weather conditions.
Q
What communication protocol does the intelligent operation and maintenance system use?
The system uses the OCPP 2.0J protocol, enabling full digital management of the charging network. This advanced protocol helps reduce overall operating and maintenance costs by up to 30% compared to traditional systems.


